TER100Tertiary

Replacement of a combustion boiler with an electric heat pump

Replacement of a combustion boiler with an electric heat pump in tertiary buildings for heating and/or DHW.

Compliant with Orden TED/845/2023 · MITECO datasheet catalogue

Calculator TER100

Try the calculation without signing up. Results are not saved.

TER100Tertiary

Replacement of a combustion boiler with an electric heat pump

Replacement of a combustion boiler with an electric heat pump in tertiary buildings for heating and/or DHW.

Calculate automatically with intelligent technology

Upload the technical sheets, invoices or certificates of the equipment before and after the action. The parameters will be filled in automatically.

Limit: 0 / 10 documents (split between BEFORE and AFTER)

BEFORE the action

Existing equipment

Drag or click to upload

PDF, image, Word or Excel

AFTER the action

New equipment

Drag or click to upload

PDF, image, Word or Excel

Calculation parameters

Want to save this calculation and create a file? Create your free account

Calculation parameters

ParameterUnitDescription
Heating demandkWh/anoAnnual heating demand of the building.
Boiler efficiency%Seasonal efficiency of the existing boiler.
Heat pump SCOP-Seasonal coefficient of performance of the heat pump.

Sustitucion de caldera de combustion por bomba de calor electrica en edificios terciarios

La descarbonizacion de la calefaccion en edificios terciarios pasa inevitablemente por la electrificacion del calor. La ficha TER100 del catalogo CAE reconoce el ahorro que se obtiene al sustituir una caldera de combustion (gas natural, gasoleo, GLP) por una bomba de calor electrica para la producción de calefaccion y/o agua caliente sanitaria.

Esta actuacion es una de las mas impactantes en terminos de reducción de emisiones y ahorro de energía primaria, ya que una bomba de calor con un SCOP de 4,0 consume cuatro veces menos energía primaria que una caldera de gas para producir la misma cantidad de calor. Los edificios de oficinas, hospitales, residencias y centros educativos con calderas antiguas son candidatos ideales para esta sustitucion.

La creciente descarbonizacion de la red electrica española amplifica el beneficio ambiental de esta medida, al producirse la electricidad con una proporcion cada vez mayor de fuentes renovables.

Fundamento técnico del ahorro por sustitucion de caldera por bomba de calor

Comparacion de rendimientos

  • Caldera convencional de gas: Rendimiento 85-92% (0,85-0,92 kWh util por kWh de gas).
  • Caldera de condensacion: Rendimiento 95-108% sobre PCI.
  • Bomba de calor electrica: SCOP 3,0-5,5 (3,0 a 5,5 kWh util por kWh electrico).

El ahorro en energía final y primaria depende del rendimiento de la caldera sustituida, del SCOP de la bomba de calor y de los factores de paso de energía final a primaria para cada vector energético.

Ejemplo de calculo para TER100

Sustitucion de caldera de gas por bomba de calor en una residencia de ancianos:

  • Demanda de calefaccion y ACS: 350.000 kWh/ano
  • Rendimiento caldera gas: 0,88
  • SCOP bomba de calor: 3,8
Consumo gas antes = 350.000 / 0,88 = 397.727 kWh/ano
Consumo electrico después = 350.000 / 3,8 = 92.105 kWh/ano

Ahorro energía final equivalente = 397.727 - 92.105 = 305.622 kWh/ano

Conversion a MWh con factores de paso:
Energia primaria antes = 397.727 x 1,19 = 473.295 kWh
Energia primaria después = 92.105 x 2,007 = 184.855 kWh
Ahorro primaria = 288.440 kWh/ano = 288,44 MWh/ano

Ahorro final para CAE = 120,18 MWh/ano

CAE total = 120,18 MWh

Valoracion = 120 MWh x 100 EUR/MWh = 12.018 EUR

Errores frecuentes en verificación ENAC para TER100

  • No acreditar el rendimiento de la caldera sustituida: El rendimiento debe documentarse mediante mediciones, ficha del equipo o estimaciones normativas según antiguedad.
  • Sobreestimar el SCOP: El SCOP real en condiciones de campo puede ser inferior al nominal; debe justificarse con datos del fabricante para las condiciones climaticas del emplazamiento.
  • No contabilizar el consumo electrico de equipos auxiliares: Bombas de circulacion, ventiladores del evaporador y resistencias de desescarche deben incluirse.
  • Aplicar factores de paso obsoletos: Los factores de conversion de energía final a primaria se actualizan periodicamente; utilizar los vigentes.

Normativa para TER100

  • Orden TED/845/2023: Ficha TER100.
  • Real Decreto 36/2023: Sistema de obligaciones y CAE.
  • RITE: Requisitos de instalaciones termicas y rendimiento de generadores.
  • EN 14825: Ensayo de rendimiento estacional de bombas de calor.

Required documents

  • D1Reference-situation documentation (existing equipment)
  • D2Technical documentation of the new equipment (datasheet, certificates)
  • D3Invoice or contract for the action
  • D4Before/after photographic report
  • D5Supporting savings calculation (generated automatically)

Related resources

Start now

Create a file with datasheet TER100

14 days free. No card. No commitment.

Start now